Industrial and warehouse

Structural mezzanine within an existing warehouse

A steel mezzanine inserted into an operating warehouse, used here to demonstrate how alteration projects are presented.

Placeholder entry. This page demonstrates the project detail layout. The project name, location, year, scope and any client attribution are outstanding and must be confirmed by the practice before publication.
Role
Structural engineer
Structural system
Steel beam and column mezzanine on new pad footings, independent of the existing frame
Structure type
Independent steel mezzanine
Existing structure
Assessed, not relied upon for new load
Stage
Design and documentation

Scope

  • Assessment of the existing slab and frame
  • Mezzanine framing and footing design
  • Stair and edge protection structural design
  • Documentation for building approval

The constraint

Inserting a floor into a building that is already operating means the new structure has to land somewhere the occupier can afford to lose, and it has to be built without shutting the facility down.

Structural approach

The mezzanine is framed independently on its own columns and footings rather than hung from or braced against the existing portal frame. That avoids adding load to a structure whose original design basis may not be fully documented, and it keeps the two systems separable.

Verification of existing structure

The existing slab was assessed for the new footing loads before any reliance was placed on it. Where the original design documentation was unavailable, capacity was established by inspection and measurement rather than assumption.

All projects